Reference Project
MasterTag’s new 95,000-square-foot production facility in Michigan represents a major expansion for the horticulture care tag manufacturer.
Construction Year
2025
General Contractor
Installation Contractor
Designed to connect the company’s main office, fulfillment center, and production operations into one streamlined campus, the new MasterTag facility supports improved technology integration, upgraded equipment, and a more efficient lean production workflow. The expansion creates new opportunities for increased productivity while positioning the company for long-term growth.
FALK partnered with Steel Center Supply and Winberg Construction to supply our HFW-40 insulated metal wall panel for the facade of the 95,000 SF building. The HFW-40 panel was finished with our Micro Rib profile, our PVDF Dove Grey coating on the exterior, and our PE Bright White finish on the interior. The use of our HFW-40 panels created a clean and durable envelope designed for long-term performance and modern industrial aesthetics.
| Construction Year | 2025 |
| Architect | CDS |
| General Contractor | Winberg Construction |
| Installation Contractor | Steel Center Supply |
My Request
Enter your name and email address to receive unlimited access and unrestricted downloads.